Sir Keir Starmer’s administration is ‘minded to approve’ a second runway for Gatwick Airport – the decision delayed until October. That’s because the Government says its ‘take-off’ is dependent on 54% arriving by public transport as the airport is expected to generate 30 million more passengers!
But Gatwick is condemned to failure and will lose out for two currently insuperable reasons. Firstly, it is trapped on the Brighton Mainline which imposes a straightjacket on any expansion of passengers arriving by train. The Sussex route is, as Network Rail says ‘a major barrier to growth’ – already at over-capacity, caused by the amount of services which it has to accommodate from multiple coastal towns and stations in between where commuters and off-peak passengers jostle for space. It’s a decades-long problem which the DfT mandarins and successive Governments have disgracefully allowed to fester.
Twenty years ago Network Rail fully appreciated its growing dilemma with too many passengers using the line between London and Brighton. Two solutions were proposed – one was to have longer (16-car) trains, but this would mean extensive track alterations and platform lengthening. Their other proposal seriously suggested introducing continental-style double-deck trains; however, the route’s Victorian tunnels presented problems. Network Rail proposed building seven new parallel tunnels to Brighton, with one track being slued to the middle of the old tunnels for these higher-gauge trains. A drawback was the extended ‘dwell time’ at stations while people boarded and whereas more passengers could be carried, neither option would enable any more services to operate!
This is why BML2 was developed in 2010. With just one new tunnel through the South Downs, a wholly viable, new and direct main line from London to the Sussex Coast – to Brighton, Lewes, Eastbourne, Newhaven, etc, would be created. Thus, the age-old crisis could be solved by restoring the Uckfield (Wealden) line to its former main line status and re-routing some services to give Network Rail additional capacity for more trains on the Brighton line.
The above is just a short extract from the full article that can be read in "The News" section of this website