The News

  BML2Logo

bringing important railway connections together

Wealden Line 2022 Logo

The BML2 Wealden Line Team have just published their report which has been submitted to the GBR Transition Team following their recent "Call For Evidence - Whole Industry Strategic Plan." 

GBR Call for Evidence Wealden Line Campaign cover720

This report is now available for everyone to download, print and share with friends and colleagues.

This is a 21-page A4 size document, with fully detailed references. Click on image to download.

We advise printing using a A4 colour printer. as you may well want to retain the document for future reference.

Wealden Line Route Plan 2022

The BML2 Wealden Line 2022 Route Plan shown in this report, has now been released for downloading and printing in A4 format. It clearly shows the planned electrification of the Wealden Line as well as the proposed route for rebuilding the missing 7-mile link to the South Coast (via the Coastway East connection to give access to Eastbourne/Newhaven/Seaford/Lewes as well as Falmer/Brighton). Click on image to download